Urbanaac

contact us
Office Locations
We usually respond within 24 hours. Alternateively you’re welcome to call our offices.

404-405, Shapath 4, Opp. Karnavati Club, S.G. Highway, Ahmedabad – 380015, Gujarat, India.

079-40050411 / 66150411

+91 99981 85147

info@urbanaac.com

Precast Construction: Ideal for Hotels

Precast construction is ideal for hotels due to its ability to combine structural efficiency with aesthetic versatility. One of the standout benefits is the capability to create long spans without the need for intermediate supports, allowing for spacious, open areas that enhance the guest experience.

5%

Constructed

Fairmont Hotel

We take immense pride in contributing to The Fairmont Hotel project, a hallmark of luxury among Mumbai’s most prestigious 5-star accommodations. By supplying essential prestressed precast elements, we have played a crucial role in realizing this landmark development.

0 +
SQ.FT Precast
0 %
Products

Product that we have supplied

Providing a comprehensive range of high-quality precast products tailored to meet the exact needs of a structure.

Prestressed Beams
Hollow Core Slabs
Precast Stairs

Key Highlights:

  • Catering to a site approximately 550 kms from our manufacturing facility.
  • Our high-quality prestressed precast elements, spanning up to 9.90 meters, enhance the enduring grandeur of this iconic structure.
  • The unique design of the hotel is situated adjacent to the T2 of Chhatrapati Shivaji Maharaj International Airport and above Mumbai’s underground rail network, adding to its distinctive location and engineering challenge.

how we work.

We get it right the first time

01
first step

Design and Planning

  • Comprehensive architectural and structural design tailored to the specific needs of the IT SEZ.
  • Detailed planning and coordination with stakeholders to ensure alignment with project goals.
02
second step

Precast Component Manufacturing

  • Production of high-quality precast components in a controlled factory environment.
  • Rigorous quality control and precision engineering to ensure consistency and durability.
03
third step

Logistics and Delivery

  • Efficient transportation planning to deliver precast components to the construction site.
  • Coordinating delivery schedules to ensure timely and organized arrival of materials.
04
fourth step

Installation and Assembly

  • Transporting precast components to the site and assembling them with meticulous accuracy.
  • Continuous on-site monitoring and quality checks to guarantee structural integrity and alignment with design specifications.